Electrical upgrades QC 1 Electrical upgrades QC OUR ID(Required)1. If there's any stucco patches, was the work done cleanly and waterproofed?(Required) PASS FAIL N/A 2. Are the lugs used for grounds/neutrals UL listed/match brand of the panel?(Required) PASS FAIL 3. Are there any double lugged breakers in the main panel?(Required) PASS FAIL 4. Was the panel schedule completed properly?(Required) PASS FAIL 5. Are the ground rods done properly? Gas/water bond complete?(Required) PASS FAIL N/A 6. Does the breaker sizes match plans?(Required) PASS FAIL Notes7. Does the wire sizes match plans?(Required) PASS FAIL Notes8. Are there any multi-wire connections? All L1&2 going to a 2-pole breaker and bundled with a neutral if applicable(Required) PASS FAIL Notes9. If we have aluminum to copper connection, was it done with the properly?(Required) PASS FAIL N/A Notes10. If a trench is applicable, does the depth/material match plans? and was the work completed properly?(Required) PASS FAIL N/A NotesPULL BACKS OF THE JOB SITE SHOWING BEST PARTS OF THE WORK(Required)Max. file size: 128 MB. PHOTOS OF FAILURES SHOWING REASONS OF ANY FAILED SECTIONMax. file size: 128 MB. Overall quality and workmanship score (1-10)(Required)Please enter a number from 1 to 10.Email(Required) Please sign your name(Required)