INSTALL QC FORM 1 INSTALL QC FORM OUR ID(Required)1. Do the approved plans/live cad match install?(Required) PASS FAIL 2. Do the breakers and/or fuses throughout the system match what’s on the plans?(Required) PASS FAIL 3. Are any stripped or cut through wires?(Required) PASS FAIL 4. Is the wire size accurate?(Required) PASS FAIL 5. Does the equipment location match the plans?(Required) PASS FAIL 6. Are all the conductors tight?(Required) PASS FAIL 7. Are the conduits and boxes bonded?(Required) PASS FAIL 8. Is all the equipment mounted tightly on the wall?(Required) PASS FAIL 9. Are the conduits overlled?(Required) PASS FAIL 10. Are all the COUPLERS/CONNECTORS tight?(Required) PASS FAIL 11. Do we have 36” clearance from water, gas, or any abstractions?(Required) PASS FAIL 12. Do the labels installed match the label sheet on the plans?(Required) PASS FAIL 13. Is the deadfront flush mounted with no gaps or openings?(Required) PASS FAIL 14. Are there any double lugged breakers in the main panel?(Required) PASS FAIL Notes15. Does the number of strings coming from the J-box to the inverter match plans?(Required) PASS FAIL Notes16. Are the solar panels mounted per approved plans?(Required) PASS FAIL Notes17. Are there any hanging wires on the roof?(Required) PASS FAIL Notes18. Are all rails the grounded correctly?(Required) PASS FAIL Notes19. Does the re setback match the plans?(Required) PASS FAIL Notes20. Is the job site clean to standards?(Required) PASS FAIL 21. If required by local AHJ, are there two new ground rods installed?(Required) PASS FAIL N/A 22. If there's a trench, is the depth/material per plans?(Required) PASS FAIL N/A 23. If battery job with a heat detector, is the garage heat detector interconnected with the rest of the house’s smoke detectors?(Required) PASS FAIL N/A 24. If LST/DER collar are the neutral and the ground bonded in the fused disco?(Required) PASS FAIL N/A Notes25. If an existing system is on site do we have system number labels installed?(Required) PASS FAIL N/A NotesOVERALL QUALITY OF INSTALL SCORE (1-10)(Required)Please enter a number from 1 to 10.PULL BACKS OF THE JOB SITE SHOWING BEST PARTS OF THE WORK(Required)Max. file size: 128 MB. PHOTOS OF FAILURES SHOWING REASONS OF ANY FAILED SECTIONMax. file size: 128 MB. Additional notesEmail(Required) Please sign your name(Required)